Connecting to the Sewer

Your Guide to Completing Phase 1 Private Sewer Connections

Each property type may have different requirements and timeframes allowing for a connection to the Sewer System. Please select the property you are interested in learning more information about installing private connections or applying for funding to cover installation and septic tank abandonment costs.

Applications / Forms

District Requirements

A property owner must meet the following requirements prior to connecting to the system:

  • The property must have an accurately recorded shared cost of the Phase 1 Sewer Assessment levied on the property;
  • A property must only connect during the timeframe allowed by the District as reflected on the lateral connection map or fines will be imposed.
  • The owner must acknowledge that he or she is responsible for maintaining the lateral line free and clear of debris, from the structure passed the property line, all the way to the mainline.
  • The owner must obtain all required permits and inspections, and pay all fees associated with obtaining such documents.