Private Property Connections

Your Guide to Phase 1 Sewer Connections

Each property in the Phase 1 area must connect to the sewer system. 

Use this interactive GIS map to find the approximate location of the septic tank and sewer stub-out. 

Low-interest loans and grants are available to help pay for the private connections.  

Please view the construction guidelines for your reference.

Applications / Forms

District Requirements

A property owner must meet the following requirements prior to connecting to the system:

  • The property must have an accurately recorded shared cost of the Phase 1 Sewer Assessment levied on the property;
  • A property must only connect during the timeframe allowed by the District as reflected on the lateral connection map or fines will be imposed.
  • The owner must acknowledge that he or she is responsible for maintaining the lateral line free and clear of debris, from the structure passed the property line, all the way to the mainline.
  • The owner must obtain all required permits and inspections, and pay all fees associated with obtaining such documents.